Thursday, June 23, 2016
Aileron Rigging
Rigged up the left aileron after replacing the universal joint which was torn, as well as replacing the bellhorn with the beefed up version per CP-58, rod ends with -4 per CP-103, and torque tubes with steel per CP-49.
Subscribe to:
Posts (Atom)